Sidewalk Installation & Swale Improvements (PN Number 31)
Installing, replacing or repairing the sidewalks and handicap ramps in the entire neighborhood.
Status: Completed December 2003.
Street Overlay & Swale Improvement (PN Number 32)
Improvements in various locations of the neighborhood such as: milling and/or overlay of roads and installation of sod and trees on the swales will be conducted.
Status: Completed December 2003.
NE 172 Street Roadway Improvement (PN Number 33)
Drainage, curbing, road reconstruction, sidewalk, street lighting and landscaping improvements have been conducted on NE 172nd Street between NE 18th Avenue and NE 19th Avenue.
Status: Completed May 2003.
Street Light Upgrading and Addition (PN Number 30)
The street lighting was upgraded throughout the entire neighborhood. In addition, sidewalks were installed, trees were planted and new sod was placed in the swales. NE 172nd Street was reconstructed between NE 18th Avenue and NE 19th Avenue.