City Center

City Center Improvement Projects

Street Light Upgrading and Addition (PN Number 5)

  • Replacing existing 100-watt fixtures with 200-watt Cobra Head fixtures and adding lights as necessary in the entire neighborhood.
  • Status: Projected completion: TBA.

NE 171st Street Roadway and Swale Improvement (PN Number 51)

  • Curbing, on-street parking and landscaping on the corner of NE 171 Street and West Dixie Highway.
  • Status: Completed: October 2004.

NE 18th Avenue Drainage Improvement (PN Number 49)

  • Drainage and road resurfacing (10% matching fund with 90% Transit Tax) on NE 18th Avenue between NE 163 Street and South Glades Drive
  • Status: Completed: August 2004.

NE 169 Street Roadway Improvement (PN Number 48)

  • Curbing, on-street parking and landscape (50% matching fund with Transit Tax) on NE 169 Street between NE 18 Avenue and 19 Avenue
  • Status: Completed March 2004.
Sidewalk Instaltion and Replacement

Sidewalk Installation and Replacement (PN Number 39)

  • The installation of new sidewalks and landscaping was constructed between NE 171st and NE 168th Street in the area west of NE 19th Avenue and east of Snake Creek Waterway. The entire neighborhood also had sidewalks and handicap ramps installed, replaced or repaired.
  • Status: Completed June 2003.

University Park Street Overlay & Swale Improvement (PN Number 40)

  • Various roads located in the neighborhood were milled and/or overlaid; also sod and trees were installed on the swales.
  • Status: Completed June 2003.

"Mainstreet" / NE 164th Street Project (PN Number 8)

  • Curbing, sidewalks, parking, decorative street lighting, stamped concrete crosswalks and landscaping were installed on NE 164th Street from NE 18th Avenue to NE 19th Avenue.
  • Status: Completed March 2002.

University Park Street Light Upgrading & Addition (PN Number 38)

  • Replaced existing 100-watt fixtures with 250-watt Cobra Head fixtures and added lights as necessary in the entire neighborhood.
  • Status: Completed March 2002.

Sidewalk Installation & Replacement (PN Number 6)

  • Installed, replaced or repaired the sidewalks and handicap ramps in various locations in the neighborhood.
  • Status: Completed November 2001.
164th Street after Overlay and Swale Improvement

Street Overlay and Swale Improvement (PN Number 7)

  • Various roads located in the neighborhood were milled and/or overlaid; also sod and trees were installed on the swales.
  • Status: Completed November 2001.